Data contoh.
CM-2611-0107
Auxiliary Drive Motor
P1 DaruratCompletedDeskripsi pelapor
Dilaporkan Operator A · 08.05
Motor bergetar keras dan panas.
Timestamp
| T0 | Tf | T1 | T2 | T3 | T4 |
|---|---|---|---|---|---|
| 08.05 | 07.58 | 08.31 | 10.02 | 10.20 | – |
Completed 10.40 oleh Teknisi Elec 1.
Metrik
| Metrik | Nilai | Rumus |
|---|---|---|
| Respons | 26 m | T1 − T0 |
| Pemulihan | 1 j 57 m | T2 − T0 |
| Perbaikan aktif | 1 j 31 m | T2 − T1 |
| Tunggu | 40 m · Spare part 30 m, Lainnya 10 m | Σ jeda per alasan |
| Wrench time | 51 m | (T2 − T1) − Tunggu |
| Downtime | 2 j 22 m | T3 − Tf |
Yang OFF
| Level | Status |
|---|---|
| Equipment | OFF |
| Sub-sistem | OFF |
| Sistem | OFF |
| Menahan start | Ya |
Teknisi
| Teknisi | Jenis | Waktu |
|---|---|---|
| Teknisi Elec 1 | T1 | 08.31 |
| Teknisi Mech 1 | Gabung | 08.40 |
Jeda
| Alasan | Mulai–selesai | Durasi |
|---|---|---|
| Spare part | 08.55–09.25 | 30 m |
| Lainnya · Menunggu crane | 09.30–09.40 | 10 m |
Data kegagalan (ISO 14224)
| Field | Nilai |
|---|---|
| Mode kegagalan | UST Stop tak terduga (trip) |
| Mekanisme | 1.2 Getaran |
| Penyebab | 3.4 Keausan wajar |
| Metode deteksi | 6 Gangguan produksi |
| Aktivitas | 1 Ganti |
Spare part dipakai
Memakai spare part · Bearing sisi NDE 1 buah
Riwayat perubahan
| Entitas | Field | Nilai lama | Nilai baru | Pengguna | Peran | Waktu | Alasan | Sumber | Batch |
|---|---|---|---|---|---|---|---|---|---|
| Belum ada riwayat perubahan. | |||||||||