Rencana PM

Rencana pemeliharaan berkala per Sub-sistem dan Work Center. WO PM dibuat otomatis 30 hari ke depan.

Rencana PM, urut Work Center lalu tag Sub-sistem.
Work CenterSub-sistemSistemLineIntervalEstimasi (j)Toleransi (hari)Item checklistJatuh tempo berikutnyaWO PM 30 hariStatus
MEC 1RK3-DS Drive SystemRotary Kiln 3Production Line 31 bulan6,033 Ukur, 2 Periksa26 Nov 20261Aktif
MEC 1RK3-DS Drive SystemRotary Kiln 3Production Line 36 bulan16,075 Ukur, 3 Periksa2 Mar 20270Aktif
MEC 1RK3-RK Rotary KilnRotary Kiln 3Production Line 32 minggu4,022 Ukur, 4 Periksa23 Nov 20262Aktif
MEC 1RK1-OME Ore Mixing EquipmentRotary Kiln 1Production Line 1 & 214 hari1,511 Ukur, 3 Periksa1 Des 20261Aktif
MEC 1RD1-DS Drive SystemRotary Dryer 1Production Line 1 & 21 bulan8,034 Ukur, 2 Periksa–0Nonaktif
ELE 1RK3-DS Drive SystemRotary Kiln 3Production Line 31 bulan3,034 Ukur, 1 Periksa4 Des 20261Aktif
ELE 1RK1-DS Drive SystemRotary Kiln 1Production Line 1 & 23 bulan5,056 Ukur, 2 Periksa15 Jan 20270Aktif
ELE 1RD1-PS Power SupplyRotary Dryer 1Production Line 1 & 21 minggu1,2500 Ukur, 5 Periksa24 Nov 20261Aktif