Data contoh.
CM-2611-0108
Main Drive Motor
P1 DaruratDipulihkanTutup WO tersedia setelah work order Completed.
Deskripsi pelapor
Dilaporkan Operator A · 09.05
Motor bergetar keras dan panas.
Timestamp
| T0 | Tf | T1 | T2 | T3 | T4 |
|---|---|---|---|---|---|
| 09.05 | 08.58 | 09.20 | 10.30 | 10.45 | – |
Metrik
| Metrik | Nilai | Rumus |
|---|---|---|
| Respons | 15 m | T1 − T0 |
| Pemulihan | 1 j 25 m | T2 − T0 |
| Perbaikan aktif | 1 j 10 m | T2 − T1 |
| Tunggu | 30 m · Spare part | Σ jeda per alasan |
| Wrench time | 40 m | (T2 − T1) − Tunggu |
| Downtime | 1 j 47 m | T3 − Tf |
Yang OFF
| Level | Status |
|---|---|
| Equipment | OFF |
| Sub-sistem | OFF |
| Sistem | OFF |
| Menahan start | Ya |
Teknisi
| Teknisi | Jenis | Waktu |
|---|---|---|
| Teknisi Elec 1 | T1 | 08.31 |
| Teknisi Mech 1 | Gabung | 08.40 |
Jeda
| Alasan | Mulai–selesai | Durasi |
|---|---|---|
| Spare part | 09.40–10.10 | 30 m |
Data kegagalan (ISO 14224)
| Field | Nilai |
|---|---|
| Mode kegagalan | UST Stop tak terduga (trip) |
| Mekanisme | – |
| Penyebab | – |
| Metode deteksi | – |
| Aktivitas | – |
Spare part dipakai
–
Riwayat perubahan
| Entitas | Field | Nilai lama | Nilai baru | Pengguna | Peran | Waktu | Alasan | Sumber | Batch |
|---|---|---|---|---|---|---|---|---|---|
| Belum ada riwayat perubahan. | |||||||||